The largest project in PML’s history, the Fort St. John Hospital represents a significant milestone in the company’s evolution. Designed from the ground up in collaboration with the project consulting engineers, as well as construction and electrical contractors, this project includes significant technical expertise including specialized clean rooms and laboratories, medical gas systems, operating room systems, medical waste systems and highly-engineered reliable building systems. The facility includes a 55-bed acute care hospital and a 123-bed residential care unit. The hospital also includes 2 new operating rooms and a single-room maternity care room. The hospital’s long-term care facility is also LEED accredited and required accredited design/build expertise.